TIME OF PROFESSIONAL SERVICES: 1997 and 2001

Brief Description: Design of a new recreational vehicle campground and community shelter. This project was completed in two phases. The first phase in 1997 constructed one of two camping loops, the community shelter and the sanitary disposal facility. The second phase in 2000 completed the second camping loop. B & A Engineers, Inc. was responsible for the expansion’s potable water system, the on-site sanitary sewer system, internal roadway design and the site grading design.